A demolition contractor in Melton has several ways to do the job. Melton is a flourishing city, and demolition is a service you may need one of these days. Before you hire someone, you have to know what methods are on the table, as it will help you justify the cost of the project.
Today, we will discuss the two main types of demolition, and also share some insights on the preparation that goes on. This should give you an idea of what goes behind any demolition project, and you will be armed with knowledge as you speak with different contractors.
1. Manual Demolition
The first and most common type of demolition is manual. The contractors use jack-hammers and sledgehammers to get the job done. Typically, we do manual demolition for small projects. An example is a small one-storey apartment.
Part of this demolition task is to remove all parts of the house or small building. Examples of these are walls and windows. Glass panels must also go, along with doors. Once the building is clear, we will proceed with hammering.
This demolition process takes a while. As you know, manual labour is no match against machines. However, this is necessary if the building is in a really populated area. We also need to do this process if there is no space where we could park heavy machinery.
Of course, we will take care of disabling the power lines and other lines that can cause any kind of hazard.
2. Implosive Demolition
The second most common type of demolition, which you typically see in a movie or in documentaries, uses explosives. Examples of these are dynamites.
This poses a real threat and danger to the surroundings, so only qualified engineers must do this. Never sign a contract with a contractor who does not have the necessary credentials to do this job.
The difference between explosion and implosion is that implosion is a blast that collapses the building. In an explosion, the trajectory of the debris is outward. This is dangerous, and debris can fly many feet away from the building.
An implosion is a heavily controlled explosion. The dynamites are carefully and strategically placed. Once they blow, debris will not come flying out. Instead, the building will collapse on itself.
3. Demolition Preparation
The last thing we want you to understand is that demolition requires a lot of planning. The government also has to be involved. After all, this process is so dangerous and can cause severe injuries to people.
Earlier, we mentioned something about clearing the building. We do the same even if we use explosives. The only thing that we should be blowing up is those that have something to do with structural integrity.
Part of planning is to determine where to drill holes. These are holes where we will place the bombs. Once this is final, we have to present this to the city engineer, or any local official who has the authority to approve it.
From there, we will proceed carefully according to our plan. We will also need to speak with the locals to ensure that they are aware. Roadblocks will be in place, too, if necessary.
Demolition Contractor Experts in Melton
Speak to an engineer before you sign a demolition contract. The engineer must be able to explain to you why he is choosing a specific process. Note that the demolition type will also have an impact on how long the project is going to take.
Give us a call at Australian Construction Services if you need help. Our experts will provide you with advice. If you need a quote now, use the “request quote” form on our website, and we will reach out to you.